How the fleet runs
Output by technology over each typical day, the load it meets, and what is left for dispatchable plant once zero-carbon output is netted off. Move the period to watch the midday net load sink as solar is built and the evening peak stay. The price is the dual of the balance constraint: what one more MW of load would cost in that hour.
Output by hour, MW โ ,
Dashed: the load. Dotted: the net load after
Price of one more MW of load โ
Price by hour and period โ
Every period at once: how the price structure moves as the fleet changes.